{"id":3259,"date":"2026-06-12T11:19:50","date_gmt":"2026-06-12T09:19:50","guid":{"rendered":"https:\/\/relaunch.solar-materials.com\/solarmodul-entsorgung\/"},"modified":"2026-06-22T14:15:44","modified_gmt":"2026-06-22T12:15:44","slug":"solar-module-recycling","status":"publish","type":"page","link":"https:\/\/solar-materials.com\/en\/solar-module-recycling\/","title":{"rendered":"Solar Module Recycling"},"content":{"rendered":"<div>With Material Recovery<\/div>\n<h1>Solar Module Recycling<\/h1>\n<h2>At a Glance<\/h2>\n<div>\n<ul role=\"list\">\n<li>Solar Materials handles disposal of crystalline solar modules and PV systems free of charge from 500 modules or 10 metric tons of module weight.<\/li>\n<li>As an ElektroG-certified waste management operation since October 2023, we issue a complete proof of disposal under ElektroG.<\/li>\n<li>With an annual capacity of 14,000 metric tons, SOLAR MATERIALS is built for the industrial processing of large module volumes.<\/li>\n<li>At our Magdeburg facility, our patented thermomechanical process extracts up to 99% of all materials contained in the module.<\/li>\n<\/ul>\n<\/div>\n<p><p>\n        <a href=\"https:\/\/solar-materials.com\/en\/inquiry\/\">Contact us<\/a>\n    <\/p>\n<\/p>\n<ul>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/Konform.svg\" alt=\"\"><\/p>\n<div>WEEE-compliant<\/div>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/Recycle-1.svg\" alt=\"\"><\/p>\n<div>99% Recovery<\/div>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/Solar-Panel.svg\" alt=\"\"><\/p>\n<div>14,000&nbsp;t Capacity p.a.<\/div>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/Free-Tag-2-1.svg\" alt=\"\"><\/p>\n<div>Free Recycling<\/div>\n<\/li>\n<\/ul>\n<h2>Why Solar Materials? Three Reasons.<\/h2>\n<ul>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/icon-01.svg\" alt=\"\"><\/p>\n<h3>Up to 99% Recovery Rate<\/h3>\n<div>\n<p>The WEEE Directive requires a recovery rate of at least 85%. Solar Materials&#8217; thermomechanical process achieves recovery rates of up to 99% and specifically recovers valuable materials.<\/p>\n<\/div>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/icon-02.svg\" alt=\"\"><\/p>\n<h3>ElektroG-Compliant Proof of Disposal<\/h3>\n<div>\n<p>Simple process, legally compliant outcome: after weighing, SOLAR MATERIALS, as a certified waste management operation, issues you a proof of disposal under ElektroG.<\/p>\n<\/div>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/icon-03.svg\" alt=\"\"><\/p>\n<h3>Free Pickup from 500 Modules<\/h3>\n<div>\n<p>Solar modules are material repositories, not waste. The recovery of silver, silicon, aluminum, and other valuable materials enables the free pickup of large module volumes.<\/p>\n<\/div>\n<\/li>\n<\/ul>\n<h2>Who Is the Right Fit for Solar Materials?<\/h2>\n<div>\n<p>SOLAR MATERIALS specializes in the industrial processing of commercial module volumes \u2014 from solar parks, repowering projects, or the decommissioning of larger installations. Smaller volumes from private PV systems can usually be disposed of free of charge at local recycling centers.<\/p>\n<\/div>\n<ul>\n<li>\n<h3>Solar Park Operators and Asset Owners<\/h3>\n<div>\n<p>Repowering projects or decommissioning operations typically involve several hundred to tens of thousands of modules at once. Solar Materials handles disposal including proof of disposal and supports logistics planning as needed.<\/p>\n<p>Typical project sizes start at approximately 500 modules.<\/p>\n<\/div>\n<p><a href=\"https:\/\/solar-materials.com\/en\/solar-park-recycling\/\">For Solar Park Operators<\/a><\/p>\n<\/li>\n<li>\n<h3>EPCs and General Contractors<\/h3>\n<div>\n<p>EPCs need predictable disposal pathways for ongoing projects. Solar Materials provides defined processes, dedicated points of contact, and reliable time windows for logistics, processing, and documentation.<\/p>\n<\/div>\n<p><a href=\"https:\/\/solar-materials.com\/en\/epcs-recycling\/\">For EPCs<\/a><\/p>\n<\/li>\n<li>\n<h3>Module Manufacturers and Importers<\/h3>\n<div>\n<p>Manufacturers and importers are subject to take-back and documentation obligations under ElektroG. Solar Materials supports operational implementation and handles legally compliant disposal of returned modules.<\/p>\n<\/div>\n<p><a href=\"https:\/\/solar-materials.com\/en\/module-manufacturers-recycling\/\">For Manufacturers<\/a><\/p>\n<\/li>\n<\/ul>\n<h2>Interested in Working Together?<\/h2>\n<div>\n<p>Whether it&#8217;s a solar park, repowering project, ESG requirements, warranty returns, or statutory take-back obligations as a module manufacturer \u2014 we will gladly assess whether free pickup of your solar modules is possible.<\/p>\n<\/div>\n<p><p>\n        <a href=\"https:\/\/solar-materials.com\/en\/inquiry\/\">Contact us<\/a>\n    <\/p>\n<\/p>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/solar-materials-mitarbeiter-an-maschine-2.jpg\" alt=\"Solar Materials Mitarbeiter arbeitet an Solarmodulen\"><\/p>\n<h2>Solar Module Disposal or Recycling? Terms Explained<\/h2>\n<div>\n<p>&#8220;Disposal&#8221; is the legal term under ElektroG. It describes the obligation for proper take-back and recovery of solar modules.<\/p>\n<p>&#8220;Recycling&#8221; refers to the technical process of material recovery.<\/p>\n<p>Those looking to dispose of solar modules are therefore typically looking for a recycling partner. Photovoltaic modules may not be landfilled \u2014 they must be directed to legally compliant recovery.<\/p>\n<p>The problem: the law measures weight, not material value. Silver accounts for only around 0.07% of module weight, but a large share of its material value. For statutory recovery rates, glass and aluminum are sufficient. Recovery of silver is not required.<\/p>\n<p>This is precisely why valuable material is lost in shredding. The layers mix, silver disperses through the shredded material, and silicon loses quality. Legally compliant \u2014 but not value-generating.<\/p>\n<p>Our thermomechanical process separates the materials instead of mixing them. The same legal compliance. A different outcome.<\/p>\n<\/div>\n<p><p>\n        <a href=\"https:\/\/solar-materials.com\/en\/inquiry\/\">PV-Recycling as a service<\/a>\n    <\/p>\n<\/p>\n<h2>Who Is Legally Required to Dispose of Solar Modules?<\/h2>\n<div>\n<p>Solar modules are classified as waste electrical and electronic equipment under ElektroG and are subject to the requirements of the European WEEE Directive.<\/p>\n<\/div>\n<ul>\n<li>\n<h3>Manufacturers and Importers<\/h3>\n<div>\n<p>Anyone who manufactures or imports solar modules in Germany is obligated to take them back and must be registered with the Stiftung EAR.<\/p>\n<\/div>\n<p><a href=\"https:\/\/solar-materials.com\/en\/inquiry\/\">Contact us<\/a><\/p>\n<\/li>\n<li>\n<h3>Operators and Contractors<\/h3>\n<div>\n<p>Operators of solar parks, EPCs, and decommissioning companies must transfer end-of-life modules to a registered disposal partner.<\/p>\n<\/div>\n<p><a href=\"https:\/\/solar-materials.com\/en\/inquiry\/\">Contact us<\/a><\/p>\n<\/li>\n<li>\n<h3>Private Individuals<\/h3>\n<div>\n<p>Private volumes can be dropped off at local recycling centers. For commercial volumes, a registered waste management operation is recommended.<\/p>\n<\/div>\n<p><a href=\"https:\/\/solar-materials.com\/en\/solar-park-recycling\/\">For Solar Park Operators<\/a><\/p>\n<\/li>\n<\/ul>\n<h3>In 5 Steps<\/h3>\n<h2>From Request to Proof of Disposal<\/h2>\n<ul>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/icon-01.svg\" alt=\"\"><\/p>\n<h3>Request and Assessment<\/h3>\n<div>\n<p>You provide us with module quantity, module type, and location. We assess the parameters and come back to you with a tailored solution for recycling and logistics.<\/p>\n<\/div>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/icon-02.svg\" alt=\"\"><\/p>\n<h3>Logistics and Pickup<\/h3>\n<div>\n<p>Solar Materials organizes Europe-wide pickup and coordinates the handover of your modules.<\/p>\n<\/div>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/icon-03.svg\" alt=\"\"><\/p>\n<h3>Incoming Inspection in Magdeburg<\/h3>\n<div>\n<p>Modules are weighed, documented, and prepared for processing.<\/p>\n<\/div>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/icon-04.svg\" alt=\"\"><\/p>\n<h3>Thermomechanical Recycling<\/h3>\n<div>\n<p>Aluminum, glass, silicon, silver, copper, and other materials are separated from one another without chemical inputs.<\/p>\n<\/div>\n<\/li>\n<li>\n<p>        <img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/icon-05.svg\" alt=\"\"><\/p>\n<h3>Proof of Disposal<\/h3>\n<div>\n<p>Upon completion of processing, you receive a complete proof of disposal under ElektroG.<\/p>\n<\/div>\n<\/li>\n<\/ul>\n<h2>Already Have Specific Module Volumes?<\/h2>\n<div>\n<p>Disposal of your solar modules at SOLAR MATERIALS is generally free of charge. Together, we assess the right process and available logistics solutions for your project.<\/p>\n<\/div>\n<p><p>\n        <a href=\"https:\/\/solar-materials.com\/en\/inquiry\/\">Contact us<\/a>\n    <\/p>\n<\/p>\n<h2>What Does Solar Module Disposal Cost?<\/h2>\n<div>\n<p class=\"font-claude-response-body break-words whitespace-normal\">At SOLAR MATERIALS, pickup is free of charge from 500 modules or 10 metric tons of module weight. Solar modules are not worthless waste \u2014 they are carriers of valuable materials. The recovery of silver, silicon, aluminum, copper, and glass enables the free disposal of large module volumes.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\">Caution is warranted with seemingly simple gray market solutions. During decommissioning, traders often offer to take end-of-life modules as used goods or resell them. This may seem attractive, but carries legal risks: without a certified proof of disposal, liability remains with the operator.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\">Since May 21, 2026, stricter requirements for cross-border waste shipments have also applied. If end-of-life modules are declared as used goods but actually exported as waste, fines, take-back obligations, and liability risks can arise.<\/p>\n<p class=\"font-claude-response-body break-words whitespace-normal\">With SOLAR MATERIALS, you receive free, legally compliant disposal through a certified waste management operation \u2014 including proof of disposal under ElektroG.<\/p>\n<\/div>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/solar-materials-mitarbeiter-an-maschine.jpg\" alt=\"Solar Materials Mitarbeiter arbeitet an einer Maschine\"><\/p>\n<h2>Certified. Documented. Operational.<\/h2>\n<ul>\n<li>\n<div>99%<\/div>\n<p>Recovery Rate<\/p>\n<div>\n<p><span>Patented thermomechanical process with no chemical inputs. Significantly exceeds regulatory requirements for material recovery and recycling.<\/span><\/p>\n<\/div>\n<\/li>\n<li>\n<div>14,000<\/div>\n<p>Tons Annual Capacity<\/p>\n<div>\n<p><span>Industrial facility in Magdeburg. Designed for large module volumes from solar parks, repowering, and decommissioning.<\/span><\/p>\n<\/div>\n<\/li>\n<li>\n<div>2023<\/div>\n<p>certified<\/p>\n<div>\n<p><span>WEEE-compliant initial treatment facility and certified waste management operation with complete documentation and proof of compliance.<\/span><\/p>\n<\/div>\n<\/li>\n<li>\n<div>> 70<\/div>\n<p>Employees<\/p>\n<div>\n<p>Growing team of recycling, logistics, and technology specialists. The foundation for building the solar circular economy at industrial scale.<\/p>\n<\/div>\n<\/li>\n<\/ul>\n<h2>Frequently Asked Questions About Solar Panel Disposal<\/h2>\n<ul>\n<li>\n<h3>How is a photovoltaic system disposed of?<\/h3>\n<div>\n<p>PV systems are first dismantled \u2014 modules, inverters, cables, and mounting structure are separated. The modules are classified as waste electrical and electronic equipment under ElektroG and must be handed over to a registered disposal partner. Solar Materials picks up modules from 500 units free of charge and issues a complete proof of disposal.<\/p>\n<\/div>\n<p><a href=\"#\">Mehr f\u00fcr Solarparkbetreiber<\/a><\/p>\n<\/li>\n<li>\n<h3>What does the disposal of photovoltaic systems cost?<\/h3>\n<div>\n<p>Conventional disposal companies charge between \u20ac180 and \u20ac210 per metric ton. Solar Materials handles disposal from 500 modules or 10 metric tons free of charge, because revenue from recovered materials refinances the recycling process. For smaller volumes, free drop-off at a local recycling center is recommended.<\/p>\n<\/div>\n<p><a href=\"#\">Mehr f\u00fcr Solarparkbetreiber<\/a><\/p>\n<\/li>\n<li>\n<h3>Are photovoltaic modules classified as hazardous waste?<\/h3>\n<div>\n<p>No. Solar modules are classified as waste electrical and electronic equipment in Category 4 under ElektroG \u2014 not as hazardous waste under the Circular Economy Act. They are, however, subject to the WEEE take-back obligation and may not be disposed of in general waste.<\/p>\n<\/div>\n<p><a href=\"#\">Mehr f\u00fcr Solarparkbetreiber<\/a><\/p>\n<\/li>\n<li>\n<h3>How much silver is in a PV module?<\/h3>\n<div>\n<p>A standard solar module contains approximately 7 grams of silver. For large installations, these amounts add up significantly: 10,000 modules together contain around 70 kilograms of silver. The actual economic significance depends on raw material prices, module type, and recovery rate. Recovering this silver is a key component in refinancing the free recycling service at Solar Materials.<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>Where can I take old solar modules?<\/h3>\n<div>\n<p>Private individuals can drop off old modules free of charge at public recycling centers. For commercial volumes, handover to a registered disposal partner is recommended. Solar Materials handles projects from 500 modules or 10 metric tons of module weight.<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>Are solar modules required to be disposed of properly?<\/h3>\n<div>\n<p>Yes. Under ElektroG, end-of-life solar modules must be handed over to a registered take-back system or certified waste management operation. Landfilling or disposal via commercial waste is not permitted and may result in regulatory fines.<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>What happens to defective solar modules?<\/h3>\n<div>\n<p>Defective modules are treated the same as functional ones \u2014 as waste electrical and electronic equipment under ElektroG. They are processed using the thermomechanical method and materials are recovered. Module condition has no effect on the free-of-charge service, provided the volume threshold is met.<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>Who is liable for the proper disposal of a PV system?<\/h3>\n<div>\n<p>Liability lies with the operator or decommissioning contractor \u2014 not automatically with the original manufacturer or supplier. A complete proof of disposal from a registered waste management operation effectively eliminates this liability. Solar Materials issues this proof after every order.<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>How long does a solar module last?<\/h3>\n<div>\n<p>The technical service life is 25 to 30 years. In practice, many modules are replaced earlier through repowering, when newer modules deliver significantly higher output with the same footprint. Damage from storms or hail can also trigger earlier disposal.<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>What obligations do module manufacturers have under ElektroG?<\/h3>\n<div>\n<p>Manufacturers and importers must register with the Stiftung EAR, provide proof of a take-back guarantee, and report volumes annually. In warranty cases or product recalls, they bear the costs of take-back and disposal. Solar Materials can take on this take-back obligation operationally as a certified partner.<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>Does Solar Materials handle complete systems or modules only?<\/h3>\n<div>\n<p>Solar Materials primarily handles modules. For complete systems \u2014 including inverters, cables, mounting structures, and foundations \u2014 we coordinate logistics partners as a turnkey service. Contact us directly for decommissioning projects.<\/p>\n<\/div>\n<\/li>\n<li>\n<h3>What is the difference between PV disposal and PV recycling?<\/h3>\n<div>\n<p>&#8220;Disposal&#8221; is the legal term under ElektroG and describes the obligation to return and recover modules. &#8220;Recycling&#8221; refers to the technical process of material recovery. Solar Materials offers both as an integrated service.<\/p>\n<\/div>\n<\/li>\n<\/ul>\n<div>Solar Module Recycling<\/div>\n<h2>Compliant.<br \/>\nSustainable.<br \/>\nFree of Charge.<\/h2>\n<div>\n<p>From compliant module take-back to high-value material recovery: SOLAR MATERIALS handles the entire value chain.<\/p>\n<\/div>\n<p><p>\n        <a href=\"https:\/\/solar-materials.com\/en\/inquiry\/\">Contact us<\/a>\n    <\/p>\n<\/p>\n<div>Or talk to us directly:<\/div>\n<p><img decoding=\"async\" src=\"\/wp-content\/uploads\/2026\/06\/solar-materials-ansprechpartnerin-petra-schmigalle.jpg\" alt=\"Ansprechpartnerin bei Solar Materials Petra Schmigalle\"><\/p>\n<div>\n<p>    <span class=\"h5-names\">Petra Schmigalle<\/span><\/p>\n<p class=\"p-small\">Sales Manager Recycling Services<\/p>\n<p class=\"p-small\"><a href=\"mailto:info@solar-materials.com\">info@solar-materials.com<\/a><br \/><a href=\"tel:+4939125190410\">+49 391 251 904 10<\/a><\/p>\n<\/div>\n<p><!--more--><br \/>\n<!-- {\"type\":\"layout\",\"children\":[{\"name\":\"SM Splitted Header Landingpage\",\"type\":\"section\",\"props\":{\"animation\":\"fade\",\"class\":\"splitted-text landingpage-header\",\"height\":\"page\",\"height_viewport\":false,\"image_position\":\"center-center\",\"image_size\":\"cover\",\"overlap\":false,\"padding_bottom\":\"none\",\"padding_top\":\"none\",\"preserve_color\":false,\"style\":\"secondary\",\"text_color\":\"light\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"\",\"width\":\"\"},\"children\":[{\"type\":\"row\",\"props\":{\"column_gap\":\"collapse\",\"layout\":\"1-2,1-2\",\"margin_bottom\":\"remove\",\"margin_top\":\"remove\",\"row_gap\":\"collapse\"},\"children\":[{\"type\":\"column\",\"props\":{\"class\":\"text\",\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"preserve_color\":false,\"vertical_align\":\"bottom\",\"width_medium\":\"1-2\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"With Material Recovery\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"div\",\"title_style\":\"h2\"}},{\"type\":\"headline\",\"props\":{\"class\":\"h1-large\",\"content\":\"Solar Module Recycling\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h1\"}}]},{\"type\":\"column\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/06\/solar-materials-header-landingpage-solarmodule-entsorgen.jpg\",\"image_position\":\"center-center\",\"image_size\":\"cover\",\"order_first\":\"xs\",\"padding\":\"xlarge\",\"position_sticky_breakpoint\":\"m\",\"vertical_align\":\"middle\",\"width_medium\":\"1-2\"}}]}]},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"padding_bottom\":\"large\",\"padding_top\":\"large\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"small\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"At a Glance\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\",\"title_style\":\"h1\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<ul role=\\\"list\\\">\\n\n\n<li>Solar Materials handles disposal of crystalline solar modules and PV systems free of charge from 500 modules or 10 metric tons of module weight.<\/li>\n\n\\n\n\n<li>As an ElektroG-certified waste management operation since October 2023, we issue a complete proof of disposal under ElektroG.<\/li>\n\n\\n\n\n<li>With an annual capacity of 14,000 metric tons, SOLAR MATERIALS is built for the industrial processing of large module volumes.<\/li>\n\n\\n\n\n<li>At our Magdeburg facility, our patented thermomechanical process extracts up to 99% of all materials contained in the module.<\/li>\n\n\\n<\/ul>\n\n\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"text_style\":\"large\"}},{\"type\":\"button\",\"props\":{\"grid_column_gap\":\"small\",\"grid_row_gap\":\"small\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"},\"children\":[{\"type\":\"button_item\",\"props\":{\"button_style\":\"default\",\"content\":\"Contact us\",\"dialog_layout\":\"modal\",\"dialog_offcanvas_flip\":true,\"icon_align\":\"left\",\"link\":\"en\/inquiry\/\"}}]}]}]}],\"name\":\"SM Das Wichtigste in K\u00fcrze\"},{\"type\":\"section\",\"props\":{\"animation\":\"fade\",\"attributes\":\"uk-scrollspy=\\\"cls: uk-animation-slide-bottom-medium; delay: 250; repeat: true;\\\"\",\"class\":\"global-element-trust-1 inhalt\",\"image_position\":\"center-center\",\"padding_bottom\":\"small\",\"padding_top\":\"small\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"expand\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"grid\",\"props\":{\"content_column_breakpoint\":\"m\",\"filter_align\":\"left\",\"filter_all\":true,\"filter_grid_breakpoint\":\"m\",\"filter_grid_width\":\"auto\",\"filter_position\":\"top\",\"filter_style\":\"tab\",\"grid_default\":\"2\",\"grid_large\":\"4\",\"grid_medium\":\"4\",\"grid_small\":\"2\",\"grid_xlarge\":\"4\",\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"item_animation\":false,\"lightbox_bg_close\":true,\"link_style\":\"default\",\"link_text\":\"Read more\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"text-meta\",\"show_content\":true,\"show_hover_image\":true,\"show_hover_video\":true,\"show_image\":true,\"show_link\":true,\"show_meta\":true,\"show_title\":true,\"show_video\":true,\"title_align\":\"top\",\"title_element\":\"div\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\",\"title_style\":\"h4\"},\"children\":[{\"type\":\"grid_item\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/06\/Konform.svg\",\"title\":\"WEEE-compliant\"}},{\"type\":\"grid_item\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/06\/Recycle-1.svg\",\"title\":\"99% Recovery\"}},{\"type\":\"grid_item\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/06\/Solar-Panel.svg\",\"title\":\"14,000&nbsp;t Capacity p.a.\"}},{\"type\":\"grid_item\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/06\/Free-Tag-2-1.svg\",\"title\":\"Free Recycling\"}}]}]}]}],\"name\":\"SM Global Element Trust 1\"},{\"type\":\"section\",\"props\":{\"class\":\"cards-steps-numbers\",\"image_position\":\"center-center\",\"padding_bottom\":\"large\",\"padding_top\":\"large\",\"style\":\"\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"expand\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Why Solar Materials? Three Reasons.\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\",\"title_style\":\"h1\"}},{\"type\":\"grid\",\"props\":{\"content_column_breakpoint\":\"m\",\"filter_align\":\"left\",\"filter_all\":true,\"filter_grid_breakpoint\":\"m\",\"filter_grid_width\":\"auto\",\"filter_position\":\"top\",\"filter_style\":\"tab\",\"grid_default\":\"1\",\"grid_medium\":\"3\",\"grid_small\":\"2\",\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"item_animation\":true,\"lightbox_bg_close\":true,\"link_style\":\"default\",\"link_text\":\"Read more\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"text-large\",\"panel_style\":\"card-default\",\"show_content\":true,\"show_hover_image\":true,\"show_hover_video\":true,\"show_image\":true,\"show_link\":true,\"show_meta\":true,\"show_title\":true,\"show_video\":true,\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\",\"title_style\":\"h4\"},\"children\":[{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>The WEEE Directive requires a recovery rate of at least 85%. Solar Materials' thermomechanical process achieves recovery rates of up to 99% and specifically recovers valuable materials.<\/p>\n\n\",\"image\":\"wp-content\/uploads\/2026\/06\/icon-01.svg\",\"title\":\"Up to 99% Recovery Rate\"}},{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>Simple process, legally compliant outcome: after weighing, SOLAR MATERIALS, as a certified waste management operation, issues you a proof of disposal under ElektroG.<\/p>\n\n\",\"image\":\"wp-content\/uploads\/2026\/06\/icon-02.svg\",\"title\":\"ElektroG-Compliant Proof of Disposal\"}},{\"type\":\"grid_item\",\"props\":{\"content\":\"\n\n<p>Solar modules are material repositories, not waste. The recovery of silver, silicon, aluminum, and other valuable materials enables the free pickup of large module volumes.<\/p>\n\n\",\"image\":\"wp-content\/uploads\/2026\/06\/icon-03.svg\",\"title\":\"Free Pickup from 500 Modules\"}}]}]}]}],\"name\":\"SM 3 Steps Cards\"},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"padding_bottom\":\"large\",\"padding_top\":\"large\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"small\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Who Is the Right Fit for Solar Materials?\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"maxwidth\":\"2xlarge\",\"title_element\":\"h2\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>SOLAR MATERIALS specializes in the industrial processing of commercial module volumes \u2014 from solar parks, repowering projects, or the decommissioning of larger installations. Smaller volumes from private PV systems can usually be disposed of free of charge at local recycling centers.<\/p>\n\n\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"text_style\":\"large\"}},{\"type\":\"accordion\",\"props\":{\"collapsible\":true,\"content_column_breakpoint\":\"m\",\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"default\",\"link_text\":\"Read more\",\"show_image\":true,\"show_link\":true},\"children\":[{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>Repowering projects or decommissioning operations typically involve several hundred to tens of thousands of modules at once. Solar Materials handles disposal including proof of disposal and supports logistics planning as needed.<\/p>\n\n\\n\n\n<p>Typical project sizes start at approximately 500 modules.<\/p>\n\n\",\"link\":\"en\/solar-park-recycling\/\",\"link_text\":\"For Solar Park Operators\",\"title\":\"Solar Park Operators and Asset Owners\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>EPCs need predictable disposal pathways for ongoing projects. Solar Materials provides defined processes, dedicated points of contact, and reliable time windows for logistics, processing, and documentation.<\/p>\n\n\",\"link\":\"en\/epcs-recycling\/\",\"link_text\":\"For EPCs\",\"title\":\"EPCs and General Contractors\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>Manufacturers and importers are subject to take-back and documentation obligations under ElektroG. Solar Materials supports operational implementation and handles legally compliant disposal of returned modules.<\/p>\n\n\",\"link\":\"en\/module-manufacturers-recycling\/\",\"link_text\":\"For Manufacturers\",\"title\":\"Module Manufacturers and Importers\",\"title_structure\":\"H3\"}}]}]}]}],\"name\":\"SM Text + Accordion\"},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"padding_bottom\":\"large\",\"padding_top\":\"large\",\"style\":\"secondary\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"small\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Interested in Working Together?\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\",\"title_style\":\"h1\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>Whether it's a solar park, repowering project, ESG requirements, warranty returns, or statutory take-back obligations as a module manufacturer \u2014 we will gladly assess whether free pickup of your solar modules is possible.<\/p>\n\n\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"}},{\"type\":\"button\",\"props\":{\"grid_column_gap\":\"small\",\"grid_row_gap\":\"small\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"},\"children\":[{\"type\":\"button_item\",\"props\":{\"button_style\":\"default\",\"content\":\"Contact us\",\"dialog_layout\":\"modal\",\"dialog_offcanvas_flip\":true,\"icon_align\":\"left\",\"link\":\"en\/inquiry\/\"}}]}]}]}],\"name\":\"SM Global Element Soft CTA\"},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"padding_bottom\":\"large\",\"padding_top\":\"large\",\"style\":\"\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"\"},\"children\":[{\"type\":\"row\",\"props\":{\"width\":\"default\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/06\/solar-materials-mitarbeiter-an-maschine-2.jpg\",\"image_alt\":\"Solar Materials Mitarbeiter arbeitet an Solarmodulen\",\"image_svg_color\":\"emphasis\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"}}]}]},{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Solar Module Disposal or Recycling? Terms Explained\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>\\\"Disposal\\\" is the legal term under ElektroG. It describes the obligation for proper take-back and recovery of solar modules.<\/p>\n\n\\n\n\n<p>\\\"Recycling\\\" refers to the technical process of material recovery.<\/p>\n\n\\n\n\n<p>Those looking to dispose of solar modules are therefore typically looking for a recycling partner. Photovoltaic modules may not be landfilled \u2014 they must be directed to legally compliant recovery.<\/p>\n\n\\n\n\n<p>The problem: the law measures weight, not material value. Silver accounts for only around 0.07% of module weight, but a large share of its material value. For statutory recovery rates, glass and aluminum are sufficient. Recovery of silver is not required.<\/p>\n\n\\n\n\n<p>This is precisely why valuable material is lost in shredding. The layers mix, silver disperses through the shredded material, and silicon loses quality. Legally compliant \u2014 but not value-generating.<\/p>\n\n\\n\n\n<p>Our thermomechanical process separates the materials instead of mixing them. The same legal compliance. A different outcome.<\/p>\n\n\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"}},{\"type\":\"button\",\"props\":{\"grid_column_gap\":\"small\",\"grid_row_gap\":\"small\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"},\"children\":[{\"type\":\"button_item\",\"props\":{\"button_style\":\"default\",\"content\":\"PV-Recycling as a service\",\"dialog_layout\":\"modal\",\"dialog_offcanvas_flip\":true,\"icon_align\":\"left\",\"link\":\"en\/inquiry\/\"}}]}]}],\"props\":{\"margin_top\":\"large\",\"width\":\"small\"}}],\"name\":\"SM Image Content-Width + Text\"},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"padding_bottom\":\"large\",\"padding_top\":\"large\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"small\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Who Is Legally Required to Dispose of Solar Modules?\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"maxwidth\":\"2xlarge\",\"title_element\":\"h2\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>Solar modules are classified as waste electrical and electronic equipment under ElektroG and are subject to the requirements of the European WEEE Directive.<\/p>\n\n\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"text_style\":\"large\"}},{\"type\":\"accordion\",\"props\":{\"collapsible\":true,\"content_column_breakpoint\":\"m\",\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"default\",\"link_text\":\"Read more\",\"show_image\":true,\"show_link\":true},\"children\":[{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>Anyone who manufactures or imports solar modules in Germany is obligated to take them back and must be registered with the Stiftung EAR.<\/p>\n\n\",\"link\":\"en\/inquiry\/\",\"link_text\":\"Contact us\",\"title\":\"Manufacturers and Importers\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>Operators of solar parks, EPCs, and decommissioning companies must transfer end-of-life modules to a registered disposal partner.<\/p>\n\n\",\"link\":\"en\/inquiry\/\",\"link_text\":\"Contact us\",\"title\":\"Operators and Contractors\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>Private volumes can be dropped off at local recycling centers. For commercial volumes, a registered waste management operation is recommended.<\/p>\n\n\",\"link\":\"en\/solar-park-recycling\/\",\"link_text\":\"For Solar Park Operators\",\"title\":\"Private Individuals\",\"title_structure\":\"H3\"}}]}]}]}],\"name\":\"SM Text\"},{\"type\":\"section\",\"props\":{\"class\":\"global-element-prozess\",\"image_position\":\"center-center\",\"padding_bottom\":\"large\",\"padding_top\":\"large\",\"style\":\"\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"\",\"width\":\"expand\",\"width_expand\":\"right\"},\"children\":[{\"type\":\"row\",\"props\":{\"padding_remove_horizontal\":false},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"class\":\"tagline\",\"content\":\"In 5 Steps\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"margin_bottom\":\"medium\",\"margin_top\":\"remove\",\"maxwidth\":\"2xlarge\",\"title_element\":\"h3\",\"title_style\":\"h4\"}},{\"type\":\"headline\",\"props\":{\"content\":\"From Request to Proof of Disposal\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"margin_bottom\":\"large\",\"margin_top\":\"remove\",\"maxwidth\":\"2xlarge\",\"title_element\":\"h2\",\"title_style\":\"h1\"}},{\"type\":\"panel-slider\",\"props\":{\"class\":\"cards-steps-numbers\",\"container_padding_remove\":true,\"content_align\":false,\"content_column_breakpoint\":\"m\",\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"image_svg_inline\":false,\"link_style\":\"\",\"link_text\":\"\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"text-meta\",\"nav\":\"dotnav\",\"nav_align\":\"left\",\"nav_breakpoint\":\"\",\"panel_card_offset\":false,\"panel_image_no_padding\":false,\"panel_match\":true,\"panel_style\":\"card-default\",\"show_content\":true,\"show_hover_image\":true,\"show_hover_video\":true,\"show_image\":true,\"show_link\":false,\"show_meta\":true,\"show_title\":true,\"show_video\":true,\"slidenav\":\"\",\"slidenav_breakpoint\":\"xl\",\"slidenav_margin\":\"medium\",\"slidenav_outside_breakpoint\":\"xl\",\"slider_autoplay_pause\":true,\"slider_center\":false,\"slider_finite\":true,\"slider_gap\":\"medium\",\"slider_row_align\":false,\"slider_width\":\"fixed\",\"slider_width_default\":\"4-5\",\"slider_width_large\":\"1-4\",\"slider_width_medium\":\"1-3\",\"slider_width_small\":\"3-5\",\"slider_width_xlarge\":\"1-4\",\"title_align\":\"top\",\"title_element\":\"h3\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\",\"title_style\":\"h4\"},\"children\":[{\"type\":\"panel-slider_item\",\"props\":{\"content\":\"\n\n<p>You provide us with module quantity, module type, and location. We assess the parameters and come back to you with a tailored solution for recycling and logistics.<\/p>\n\n\",\"image\":\"wp-content\/uploads\/2026\/06\/icon-01.svg\",\"meta\":\"\",\"title\":\"Request and Assessment\"}},{\"type\":\"panel-slider_item\",\"props\":{\"content\":\"\n\n<p>Solar Materials organizes Europe-wide pickup and coordinates the handover of your modules.<\/p>\n\n\",\"image\":\"wp-content\/uploads\/2026\/06\/icon-02.svg\",\"meta\":\"\",\"title\":\"Logistics and Pickup\"}},{\"type\":\"panel-slider_item\",\"props\":{\"content\":\"\n\n<p>Modules are weighed, documented, and prepared for processing.<\/p>\n\n\",\"image\":\"wp-content\/uploads\/2026\/06\/icon-03.svg\",\"meta\":\"\",\"title\":\"Incoming Inspection in Magdeburg\"}},{\"type\":\"panel-slider_item\",\"props\":{\"content\":\"\n\n<p>Aluminum, glass, silicon, silver, copper, and other materials are separated from one another without chemical inputs.<\/p>\n\n\",\"image\":\"wp-content\/uploads\/2026\/06\/icon-04.svg\",\"meta\":\"\",\"title\":\"Thermomechanical Recycling\"}},{\"type\":\"panel-slider_item\",\"props\":{\"content\":\"\n\n<p>Upon completion of processing, you receive a complete proof of disposal under ElektroG.<\/p>\n\n\",\"image\":\"wp-content\/uploads\/2026\/06\/icon-05.svg\",\"meta\":\"\",\"title\":\"Proof of Disposal\"}}]}]}]}],\"name\":\"SM Global Element Prozess (Modulabgeber)\"},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"padding_bottom\":\"large\",\"padding_top\":\"large\",\"style\":\"secondary\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"small\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Already Have Specific Module Volumes?\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\",\"title_style\":\"h1\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>Disposal of your solar modules at SOLAR MATERIALS is generally free of charge. Together, we assess the right process and available logistics solutions for your project.<\/p>\n\n\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"maxwidth\":\"2xlarge\"}},{\"type\":\"button\",\"props\":{\"grid_column_gap\":\"small\",\"grid_row_gap\":\"small\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"},\"children\":[{\"type\":\"button_item\",\"props\":{\"button_style\":\"default\",\"content\":\"Contact us\",\"dialog_layout\":\"modal\",\"dialog_offcanvas_flip\":true,\"icon_align\":\"left\",\"link\":\"en\/inquiry\/\"}}]}]}]}],\"name\":\"SM Global Element Soft CTA\"},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"padding_bottom\":\"large\",\"padding_top\":\"large\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"default\"},\"children\":[{\"type\":\"row\",\"props\":{\"layout\":\"1-2,1-2\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-2\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"What Does Solar Module Disposal Cost?\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p class=\\\"font-claude-response-body break-words whitespace-normal\\\">At SOLAR MATERIALS, pickup is free of charge from 500 modules or 10 metric tons of module weight. Solar modules are not worthless waste \u2014 they are carriers of valuable materials. The recovery of silver, silicon, aluminum, copper, and glass enables the free disposal of large module volumes.<\/p>\n\n\\n\n\n<p class=\\\"font-claude-response-body break-words whitespace-normal\\\">Caution is warranted with seemingly simple gray market solutions. During decommissioning, traders often offer to take end-of-life modules as used goods or resell them. This may seem attractive, but carries legal risks: without a certified proof of disposal, liability remains with the operator.<\/p>\n\n\\n\n\n<p class=\\\"font-claude-response-body break-words whitespace-normal\\\">Since May 21, 2026, stricter requirements for cross-border waste shipments have also applied. If end-of-life modules are declared as used goods but actually exported as waste, fines, take-back obligations, and liability risks can arise.<\/p>\n\n\\n\n\n<p class=\\\"font-claude-response-body break-words whitespace-normal\\\">With SOLAR MATERIALS, you receive free, legally compliant disposal through a certified waste management operation \u2014 including proof of disposal under ElektroG.<\/p>\n\n\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"}}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_medium\":\"1-2\"},\"children\":[{\"type\":\"image\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/06\/solar-materials-mitarbeiter-an-maschine.jpg\",\"image_alt\":\"Solar Materials Mitarbeiter arbeitet an einer Maschine\",\"image_svg_color\":\"emphasis\",\"margin_bottom\":\"remove\",\"margin_top\":\"default\"}}]}]}],\"name\":\"SM Text Bild Contentwidth\"},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"padding_bottom\":\"xlarge\",\"padding_top\":\"xlarge\",\"style\":\"secondary\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"expand\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Certified. Documented. Operational.\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\",\"title_style\":\"h1\"}},{\"type\":\"grid\",\"props\":{\"animation\":\"parallax\",\"content_column_breakpoint\":\"m\",\"filter_align\":\"left\",\"filter_all\":true,\"filter_grid_breakpoint\":\"m\",\"filter_grid_width\":\"auto\",\"filter_position\":\"top\",\"filter_style\":\"tab\",\"grid_default\":\"1\",\"grid_large\":\"4\",\"grid_medium\":\"2\",\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"item_animation\":true,\"lightbox_bg_close\":true,\"link_style\":\"default\",\"link_text\":\"Read more\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"meta_align\":\"below-title\",\"meta_element\":\"div\",\"meta_style\":\"h4\",\"show_content\":true,\"show_hover_image\":true,\"show_hover_video\":true,\"show_image\":true,\"show_link\":true,\"show_meta\":true,\"show_title\":true,\"show_video\":true,\"title_align\":\"top\",\"title_element\":\"div\",\"title_grid_breakpoint\":\"m\",\"title_grid_width\":\"1-2\",\"title_hover_style\":\"reset\",\"title_style\":\"h1\"},\"children\":[{\"type\":\"grid_item\",\"props\":{\"class\":\"my-counter\",\"content\":\"\n\n<p><span>Patented thermomechanical process with no chemical inputs. Significantly exceeds regulatory requirements for material recovery and recycling.<\/span><\/p>\n\n\",\"meta\":\"Recovery Rate\",\"title\":\"99%\"}},{\"type\":\"grid_item\",\"props\":{\"class\":\"my-counter\",\"content\":\"\n\n<p><span>Industrial facility in Magdeburg. Designed for large module volumes from solar parks, repowering, and decommissioning.<\/span><\/p>\n\n\",\"meta\":\"Tons Annual Capacity\",\"title\":\"14,000\"}},{\"type\":\"grid_item\",\"props\":{\"class\":\"my-counter\",\"content\":\"\n\n<p><span>WEEE-compliant initial treatment facility and certified waste management operation with complete documentation and proof of compliance.<\/span><\/p>\n\n\",\"meta\":\"certified\",\"title\":\"2023\"}},{\"type\":\"grid_item\",\"props\":{\"class\":\"my-counter\",\"content\":\"\n\n<p>Growing team of recycling, logistics, and technology specialists. The foundation for building the solar circular economy at industrial scale.<\/p>\n\n\",\"meta\":\"Employees\",\"title\":\"> 70\"}}]}]}],\"props\":{\"attributes\":\"uk-scrollspy=\\\"cls: uk-animation-slide-bottom-medium; delay: 400; repeat: true;\\\"\"}}],\"name\":\"SM Globale Element Trust Block (Modulabgeber)\"},{\"type\":\"section\",\"props\":{\"image_position\":\"center-center\",\"padding_bottom\":\"large\",\"padding_top\":\"large\",\"style\":\"default\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"small\"},\"children\":[{\"type\":\"row\",\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Frequently Asked Questions About Solar Panel Disposal\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"maxwidth\":\"2xlarge\",\"title_element\":\"h2\"}},{\"type\":\"accordion\",\"props\":{\"collapsible\":true,\"content_column_breakpoint\":\"m\",\"image_align\":\"top\",\"image_grid_breakpoint\":\"m\",\"image_grid_width\":\"1-2\",\"image_svg_color\":\"emphasis\",\"link_style\":\"default\",\"link_text\":\"Read more\",\"show_image\":true,\"show_link\":true},\"children\":[{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>PV systems are first dismantled \u2014 modules, inverters, cables, and mounting structure are separated. The modules are classified as waste electrical and electronic equipment under ElektroG and must be handed over to a registered disposal partner. Solar Materials picks up modules from 500 units free of charge and issues a complete proof of disposal.<\/p>\n\n\",\"link\":\"#\",\"link_text\":\"Mehr f\u00fcr Solarparkbetreiber\",\"title\":\"How is a photovoltaic system disposed of?\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>Conventional disposal companies charge between \u20ac180 and \u20ac210 per metric ton. Solar Materials handles disposal from 500 modules or 10 metric tons free of charge, because revenue from recovered materials refinances the recycling process. For smaller volumes, free drop-off at a local recycling center is recommended.<\/p>\n\n\",\"link\":\"#\",\"link_text\":\"Mehr f\u00fcr Solarparkbetreiber\",\"title\":\"What does the disposal of photovoltaic systems cost?\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>No. Solar modules are classified as waste electrical and electronic equipment in Category 4 under ElektroG \u2014 not as hazardous waste under the Circular Economy Act. They are, however, subject to the WEEE take-back obligation and may not be disposed of in general waste.<\/p>\n\n\",\"link\":\"#\",\"link_text\":\"Mehr f\u00fcr Solarparkbetreiber\",\"title\":\"Are photovoltaic modules classified as hazardous waste?\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>A standard solar module contains approximately 7 grams of silver. For large installations, these amounts add up significantly: 10,000 modules together contain around 70 kilograms of silver. The actual economic significance depends on raw material prices, module type, and recovery rate. Recovering this silver is a key component in refinancing the free recycling service at Solar Materials.<\/p>\n\n\",\"title\":\"How much silver is in a PV module?\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>Private individuals can drop off old modules free of charge at public recycling centers. For commercial volumes, handover to a registered disposal partner is recommended. Solar Materials handles projects from 500 modules or 10 metric tons of module weight.<\/p>\n\n\",\"title\":\"Where can I take old solar modules?\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>Yes. Under ElektroG, end-of-life solar modules must be handed over to a registered take-back system or certified waste management operation. Landfilling or disposal via commercial waste is not permitted and may result in regulatory fines.<\/p>\n\n\",\"title\":\"Are solar modules required to be disposed of properly?\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>Defective modules are treated the same as functional ones \u2014 as waste electrical and electronic equipment under ElektroG. They are processed using the thermomechanical method and materials are recovered. Module condition has no effect on the free-of-charge service, provided the volume threshold is met.<\/p>\n\n\",\"title\":\"What happens to defective solar modules?\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>Liability lies with the operator or decommissioning contractor \u2014 not automatically with the original manufacturer or supplier. A complete proof of disposal from a registered waste management operation effectively eliminates this liability. Solar Materials issues this proof after every order.<\/p>\n\n\",\"title\":\"Who is liable for the proper disposal of a PV system?\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>The technical service life is 25 to 30 years. In practice, many modules are replaced earlier through repowering, when newer modules deliver significantly higher output with the same footprint. Damage from storms or hail can also trigger earlier disposal.<\/p>\n\n\",\"title\":\"How long does a solar module last?\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>Manufacturers and importers must register with the Stiftung EAR, provide proof of a take-back guarantee, and report volumes annually. In warranty cases or product recalls, they bear the costs of take-back and disposal. Solar Materials can take on this take-back obligation operationally as a certified partner.<\/p>\n\n\",\"title\":\"What obligations do module manufacturers have under ElektroG?\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>Solar Materials primarily handles modules. For complete systems \u2014 including inverters, cables, mounting structures, and foundations \u2014 we coordinate logistics partners as a turnkey service. Contact us directly for decommissioning projects.<\/p>\n\n\",\"title\":\"Does Solar Materials handle complete systems or modules only?\",\"title_structure\":\"H3\"}},{\"type\":\"accordion_item\",\"props\":{\"content\":\"\n\n<p>\\\"Disposal\\\" is the legal term under ElektroG and describes the obligation to return and recover modules. \\\"Recycling\\\" refers to the technical process of material recovery. Solar Materials offers both as an integrated service.<\/p>\n\n\",\"title\":\"What is the difference between PV disposal and PV recycling?\",\"title_structure\":\"H3\"}}]}]}]}],\"name\":\"SM Accordion\"},{\"type\":\"section\",\"props\":{\"class\":\"cta\",\"image_position\":\"center-center\",\"padding_bottom\":\"xlarge\",\"padding_top\":\"xlarge\",\"style\":\"secondary\",\"title_breakpoint\":\"xl\",\"title_position\":\"top-left\",\"title_rotation\":\"left\",\"vertical_align\":\"middle\",\"width\":\"expand\"},\"children\":[{\"type\":\"row\",\"props\":{\"attributes\":\"uk-scrollspy=\\\"cls: uk-animation-slide-bottom-medium; delay: 250; repeat: true;\\\"\",\"column_gap\":\"large\",\"layout\":\"1-2,1-2\",\"row_gap\":\"large\",\"width\":\"large\"},\"children\":[{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_small\":\"1-2\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Solar Module Recycling\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"div\",\"title_style\":\"h4\"}},{\"type\":\"headline\",\"props\":{\"content\":\"Compliant.\\nSustainable.\\nFree of Charge.\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"h2\",\"title_style\":\"h1\"}},{\"type\":\"text\",\"props\":{\"column_breakpoint\":\"m\",\"content\":\"\n\n<p>From compliant module take-back to high-value material recovery: SOLAR MATERIALS handles the entire value chain.<\/p>\n\n\",\"margin_bottom\":\"default\",\"margin_top\":\"default\",\"maxwidth\":\"xlarge\"}},{\"type\":\"button\",\"props\":{\"grid_column_gap\":\"small\",\"grid_row_gap\":\"small\",\"margin_bottom\":\"default\",\"margin_top\":\"default\"},\"children\":[{\"type\":\"button_item\",\"props\":{\"button_style\":\"primary\",\"content\":\"Contact us\",\"dialog_layout\":\"modal\",\"dialog_offcanvas_flip\":true,\"icon_align\":\"left\",\"link\":\"en\/inquiry\/\"}}]}]},{\"type\":\"column\",\"props\":{\"image_position\":\"center-center\",\"position_sticky_breakpoint\":\"m\",\"width_small\":\"1-2\"},\"children\":[{\"type\":\"headline\",\"props\":{\"content\":\"Or talk to us directly:\",\"image_align\":\"left\",\"image_margin\":\"xsmall\",\"title_element\":\"div\",\"title_style\":\"h4\"}},{\"type\":\"image\",\"props\":{\"image\":\"wp-content\/uploads\/2026\/06\/solar-materials-ansprechpartnerin-petra-schmigalle.jpg\",\"image_alt\":\"Ansprechpartnerin bei Solar Materials Petra Schmigalle\",\"image_svg_color\":\"emphasis\",\"image_width\":265,\"margin_bottom\":\"default\",\"margin_top\":\"default\"}},{\"type\":\"html\",\"props\":{\"content\":\"<span class=\\\"h5-names\\\">Petra Schmigalle<\/span>\\n\n\n<p class=\\\"p-small\\\">Sales Manager Recycling Services<\/p>\n\n\\n\n\n<p class=\\\"p-small\\\"><a href=\\\"mailto:info@solar-materials.com\\\">info@solar-materials.com<\/a><br \/><a href=\\\"tel:+4939125190410\\\">+49 391 251 904 10<\/a><\/p>\n\n\"}}]}]}],\"name\":\"SM Final CTA\"}],\"version\":\"5.0.35\"} --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>With Material Recovery Solar Module Recycling At a Glance Solar Materials handles disposal of crystalline solar modules and PV systems free of charge from 500 modules or 10 metric tons of module weight. As an ElektroG-certified waste management operation since October 2023, we issue a complete proof of disposal under ElektroG. With an annual capacity [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-3259","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Solar Panel Recycling | SOLAR MATERIALS<\/title>\n<meta name=\"description\" content=\"Solar module recycling for solar parks, EPCs and manufacturers. SOLAR MATERIALS handles this free of charge from 500 modules.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/solar-materials.com\/en\/solar-module-recycling\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Solar Panel Recycling | SOLAR MATERIALS\" \/>\n<meta property=\"og:description\" content=\"Solar module recycling for solar parks, EPCs and manufacturers. SOLAR MATERIALS handles this free of charge from 500 modules.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/solar-materials.com\/en\/solar-module-recycling\/\" \/>\n<meta property=\"og:site_name\" content=\"SOLAR MATERIALS GmbH\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-22T12:15:44+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/solar-materials.com\\\/en\\\/solar-module-recycling\\\/\",\"url\":\"https:\\\/\\\/solar-materials.com\\\/en\\\/solar-module-recycling\\\/\",\"name\":\"Solar Panel Recycling | SOLAR MATERIALS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/solar-materials.com\\\/en\\\/#website\"},\"datePublished\":\"2026-06-12T09:19:50+00:00\",\"dateModified\":\"2026-06-22T12:15:44+00:00\",\"description\":\"Solar module recycling for solar parks, EPCs and manufacturers. SOLAR MATERIALS handles this free of charge from 500 modules.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/solar-materials.com\\\/en\\\/solar-module-recycling\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/solar-materials.com\\\/en\\\/solar-module-recycling\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/solar-materials.com\\\/en\\\/solar-module-recycling\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Startseite\",\"item\":\"https:\\\/\\\/solar-materials.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Solar Module Recycling\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/solar-materials.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/solar-materials.com\\\/en\\\/\",\"name\":\"SOLAR MATERIALS GmbH\",\"description\":\"Technolgief\u00fchrer f\u00fcr das Recycling von Solarmodulen, die ihr Lebensende erreicht haben\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/solar-materials.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Solar Panel Recycling | SOLAR MATERIALS","description":"Solar module recycling for solar parks, EPCs and manufacturers. SOLAR MATERIALS handles this free of charge from 500 modules.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/solar-materials.com\/en\/solar-module-recycling\/","og_locale":"en_US","og_type":"article","og_title":"Solar Panel Recycling | SOLAR MATERIALS","og_description":"Solar module recycling for solar parks, EPCs and manufacturers. SOLAR MATERIALS handles this free of charge from 500 modules.","og_url":"https:\/\/solar-materials.com\/en\/solar-module-recycling\/","og_site_name":"SOLAR MATERIALS GmbH","article_modified_time":"2026-06-22T12:15:44+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/solar-materials.com\/en\/solar-module-recycling\/","url":"https:\/\/solar-materials.com\/en\/solar-module-recycling\/","name":"Solar Panel Recycling | SOLAR MATERIALS","isPartOf":{"@id":"https:\/\/solar-materials.com\/en\/#website"},"datePublished":"2026-06-12T09:19:50+00:00","dateModified":"2026-06-22T12:15:44+00:00","description":"Solar module recycling for solar parks, EPCs and manufacturers. SOLAR MATERIALS handles this free of charge from 500 modules.","breadcrumb":{"@id":"https:\/\/solar-materials.com\/en\/solar-module-recycling\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/solar-materials.com\/en\/solar-module-recycling\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/solar-materials.com\/en\/solar-module-recycling\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Startseite","item":"https:\/\/solar-materials.com\/en\/"},{"@type":"ListItem","position":2,"name":"Solar Module Recycling"}]},{"@type":"WebSite","@id":"https:\/\/solar-materials.com\/en\/#website","url":"https:\/\/solar-materials.com\/en\/","name":"SOLAR MATERIALS GmbH","description":"Technolgief\u00fchrer f\u00fcr das Recycling von Solarmodulen, die ihr Lebensende erreicht haben","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/solar-materials.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/solar-materials.com\/en\/wp-json\/wp\/v2\/pages\/3259","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/solar-materials.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/solar-materials.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/solar-materials.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/solar-materials.com\/en\/wp-json\/wp\/v2\/comments?post=3259"}],"version-history":[{"count":81,"href":"https:\/\/solar-materials.com\/en\/wp-json\/wp\/v2\/pages\/3259\/revisions"}],"predecessor-version":[{"id":4090,"href":"https:\/\/solar-materials.com\/en\/wp-json\/wp\/v2\/pages\/3259\/revisions\/4090"}],"wp:attachment":[{"href":"https:\/\/solar-materials.com\/en\/wp-json\/wp\/v2\/media?parent=3259"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}